The other day, I helped a customer with an interesting case:

We have a 19c CDB with 100 PDBs running on old hardware. We need to upgrade and move the PDBs to a new server with Oracle Database 23ai. We would like to move the PDBs in batches.

Here’s how I would do that using AutoUpgrade and refreshable clone PDBs.

How To

  • In each PDB, you must create a user that you can use for the database link:
    create user dblinkuser identified by dblinkuser;
    grant create session to dblinkuser;
    grant select_catalog_role to dblinkuser;
    grant create pluggable database to dblinkuser;
    grant read on sys.enc$ to dblinkuser;
    
    • Repeat this process for every source PDB.
  • In the target CDB, create a database link in the root container for every PDB:
    create database link clonepdb1
    connect to dblinkuser
    identified by dblinkuser
    using 'sourcehost/pdb1';
    
    • Repeat this process for each PDB and assign a unique name to the database link.
  • Create an AutoUpgrade config that upgrades a batch of the PDBs. In this case, PDBs 1-4:
    global.global_log_dir=/home/oracle/logs
    global.keystore=/home/oracle/keystore
    
    upg1.sid=CDB19
    upg1.target_cdb=CDB23
    upg1.source_home=/u01/app/oracle/product/19
    upg1.target_home=/u01/app/oracle/product/23
    upg1.pdbs=PDB1,PDB2,PDB3,PDB4
    upg1.source_dblink.PDB1=CLONEPDB1 1800
    upg1.source_dblink.PDB2=CLONEPDB2 1800
    upg1.source_dblink.PDB3=CLONEPDB3 1800
    upg1.source_dblink.PDB4=CLONEPDB4 1800
    upg1.target_pdb_copy_option.PDB1=FILE_NAME_CONVERT=NONE
    upg1.target_pdb_copy_option.PDB2=FILE_NAME_CONVERT=NONE
    upg1.target_pdb_copy_option.PDB3=FILE_NAME_CONVERT=NONE
    upg1.target_pdb_copy_option.PDB4=FILE_NAME_CONVERT=NONE
    upg1.target_pdb_name.PDB1=PDBNEW1
    upg1.target_pdb_name.PDB2=PDBNEW2
    upg1.target_pdb_name.PDB3=PDBNEW3
    upg1.target_pdb_name.PDB4=PDBNEW4
    upg1.parallel_pdb_creation_clause.PDB1=2
    upg1.parallel_pdb_creation_clause.PDB2=2
    upg1.parallel_pdb_creation_clause.PDB3=2
    upg1.parallel_pdb_creation_clause.PDB4=2
    upg1.start_time=01/10/2026 02:30:00
    
    • In source_dblink you specify the name of the database link that you previously created. You must assign the right database link to the right PDB. The following number (1800) is the refresh rate in seconds. You can adjust that accordingly.
    • In this example, you’re using Oracle Managed Files, and FILE_NAME_CONVERT=NONE allows the target CDB to automatically generate new file names.
    • I recommend renaming the PDB to avoid any confusion. You can do that with target_pdb_name.
    • Also, limit the number of parallel processes that the target CDB can use to copy the PDB over the network. The file copy happens for all PDBs at the same time, so in this case, the target CDB should have at least 8 CPUs. Also, take the resources of the source CDB into consideration.
  • Run AutoUpgrade in analyze mode on the source database host. This checks the PDBs for upgrade readiness:
    java -jar autoupgrade.jar -config upgrade.cfg -mode analyze
    
  • Run AutoUpgrade in deploy mode on the target database host:
    java -jar autoupgrade.jar -config upgrade.cfg -mode deploy
    
    • The target CDB now starts to copy the PDBs over.
    • After that, it periodically refreshes the PDBs with redo from the source database.
    • It doesn’t proceed with the actual upgrade.
    • Instead, it waits until you reach the time specified by the start_time parameter.
  • Downtime starts now
  • Run AutoUpgrade in fixups mode on the source database host. This runs recommended and required pre-upgrade fixups in the PDBs:
    java -jar autoupgrade.jar -config upgrade.cfg -mode fixups
    
  • Instruct AutoUpgrade to move on with the upgrade even though the start_time hasn’t been reached yet:
    upg> proceed -job <job-number>
    
  • AutoUpgrade now performs a final refresh to bring over the latest changes. Then, it upgrades the PDBs concurrently. It will upgrade CPU_COUNT/2 at the same time. You can tweak that using catctl_options.
  • Be sure to stop the source PDBs that are running in the 19c CDB.

That’s it! You’ve now moved and upgraded the first batch of PDBs. You can repeat the process with the next batch.

In One Batch

Technically, you can put all PDBs into the same configuration file and move/upgrade them all at the same time.

However, you might as well use Data Guard to build a standby database and then perform an upgrade of the entire CDB.

However, if possible, I would recommend moving/upgrading the PDBs in batches.

Final Words

AutoUpgrade and refreshable clones are a perfect match.

What would you recommend? Leave a comment and let me know what you would suggest.

Further Reading

8 thoughts on “How To Upgrade 100 PDBs And Move Them To Another Server

  1. Not sure if I do something wrong.

    Getting this when executing the analyze on the source:

    AutoUpgrade is unable to connect to the source database for prefix upg1. Analyze and fixup mode is not supported for unplug-relocate when the source resides on a different system.

    Like

      1. Hi,

        sorry took me a while. Anything specific when the source/target are a RAC system? the tool is trying to connect to the sid, which is actually sid+instance_id. When I change the upg1.sid to the instance_name it’s connecting but it fails at the next step.
        Thanks,
        knut

        Like

        1. I think, it’s working now.
          Using the sid of the instance is working, however added the global.target_version and then ran into this TARGET_CDB_AVAILABILITY which can be ignored. Did use the fixup mode to complete the step on the source.

          Knut

          Like

Leave a reply to Knut Cancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.